Recommendation 3: Annually update and prioritize stream restoration and/or channel stabilization projects identified in each management plan and support efforts to obtain funding to design and implement them.
Action Item 3.1 Develop a list of candidate stream corridor projects (includes reach scale restoration, hydraulic constriction mitigation, water quality improvement projects; does not include site scale bank stabilization) through review of existing Stream Management Plans, current stream assessments, recommendations from Highway departments and municipalities.
Action Item 3.2 Work on assessment, and if project is determined to be feasible, design and construction of prioritized candidate stream corridor project. If a feasible project is not identified then an additional site from the candidate list developed in Action Item 1 above will be investigated. The first priority project is an investigation into treatment alternatives for the “Chichester” reach of Stony Clove Creek (Management Units 17 and 18 in the Stony Clove SMP). This is a reach of Stony Clove Creek between Silver Hollow bridge and the Route 214 bridge in Chichester. This reach is a chronic source of turbidity in Stony Clove Creek from stream bank erosion and adjacent hill slope failure.